Tác giả CN
| Kim,Seojun |
Nhan đề
| Design Procedure for Determining Optimal Length of Side-Weir in Flood Control Detention Basin Considering Bed Roughness Coefficient |
Từ khóa tự do
| Optimal length of side-weir |
Nguồn trích
| Journal of irrigation and drainage engineering2016
Số: 12
Tập: 142 |
|
000 | 00000nab#a2200000ui#4500 |
---|
001 | 32800 |
---|
002 | 6 |
---|
004 | CD2B0DB1-BEBC-4D49-A085-E2C22B6B9378 |
---|
005 | 201910170839 |
---|
008 | 081223s vm| vie |
---|
009 | 1 0 |
---|
039 | |y20191017083949|zcuonglv |
---|
041 | 0 |avie |
---|
100 | |aKim,Seojun |
---|
245 | |aDesign Procedure for Determining Optimal Length of Side-Weir in Flood Control Detention Basin Considering Bed Roughness Coefficient |
---|
653 | |aOptimal length of side-weir |
---|
773 | |tJournal of irrigation and drainage engineering|d2016|v142|i12 |
---|
890 | |c1|a0|b0|d1 |
---|
|
Không tìm thấy biểu ghi nào