Tác giả CN
| Shih,Neng-Hui |
Nhan đề
| Determining an optimal production run length with an extended quality control policy for an imperfect process |
Từ khóa tự do
| Lot size |
Nguồn trích
| Applied mathematical modelling.2016
Số: 4
Tập: 40 |
|
000 | 00000nab#a2200000ui#4500 |
---|
001 | 25738 |
---|
002 | 6 |
---|
004 | 9BE63900-0E24-40AA-95B4-CA0C0DE8594F |
---|
005 | 201901241537 |
---|
008 | 081223s vm| vie |
---|
009 | 1 0 |
---|
039 | |y20190124153758|zcuonglv |
---|
041 | 0 |avie |
---|
100 | |aShih,Neng-Hui |
---|
245 | |aDetermining an optimal production run length with an extended quality control policy for an imperfect process |
---|
653 | |aLot size |
---|
773 | |tApplied mathematical modelling.|d2016|v40|i4 |
---|
890 | |c1|a0|b0|d1 |
---|
|
Không tìm thấy biểu ghi nào