Tác giả CN
| Arashpour,Mehrdad |
Nhan đề
| Quantitative Analysis of Rate-Driven and Due Date – Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects |
Từ khóa tự do
| Computer simulation |
Nguồn trích
| Journal of construction enggineering and management2016
Số: 1
Tập: 142 |
| 000 | 00000nab#a2200000ui#4500 |
---|
001 | 24484 |
---|
002 | 6 |
---|
004 | 808FBE04-92E2-4F79-B995-61FB53F33368 |
---|
005 | 201812250910 |
---|
008 | 081223s vm| vie |
---|
009 | 1 0 |
---|
039 | |y20181225091154|zcuonglv |
---|
041 | 0 |avie |
---|
100 | |aArashpour,Mehrdad |
---|
245 | |aQuantitative Analysis of Rate-Driven and Due Date – Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects |
---|
653 | |aComputer simulation |
---|
773 | |tJournal of construction enggineering and management|d2016|v142|i1 |
---|
890 | |c1|a0|b0|d4 |
---|
|
Không tìm thấy biểu ghi nào
|
|
|
|