• Bài trích
  • Nhan đề: Quantitative Analysis of Rate-Driven and Due Date – Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects

Tác giả CN Arashpour,Mehrdad
Nhan đề Quantitative Analysis of Rate-Driven and Due Date – Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects
Từ khóa tự do Computer simulation
Nguồn trích Journal of construction enggineering and management2016 Số: 1 Tập: 142
00000000nab#a2200000ui#4500
00124484
0026
004808FBE04-92E2-4F79-B995-61FB53F33368
005201812250910
008081223s vm| vie
0091 0
039|y20181225091154|zcuonglv
0410 |avie
100 |aArashpour,Mehrdad
245 |aQuantitative Analysis of Rate-Driven and Due Date – Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects
653 |aComputer simulation
773 |tJournal of construction enggineering and management|d2016|v142|i1
890|c1|a0|b0|d4
Không tìm thấy biểu ghi nào
Copyrights © Thư Viện Trường ĐH XÂY DỰNG HÀ NỘI